Answers magazine is the Bible-affirming, creation-based magazine from Answers in Genesis. In it you will find fascinating content and stunning photographs that present creation and worldview articles along with relevant cultural topics from different authors. Each quarterly issue includes a detachable chart, a pullout children’s magazine, a unique animal highlight, excellent layman and semi-technical articles plus bonus content from the AnswersMagazine.com website. Our purpose is to equip you, our reader, with practical answers so you can confidently communicate the gospel and biblical authority with accuracy. Why wait? Subscribe today!

Museum photo album

Click on any image or description to see a larger photo.

To see the most up-to-date photos, please go to the Museum Blog

Go to page:  1  2  3  4  5  6  7

Interior work continues on the lobby: 26 January 2004

Interior work continues on the lobby: 26 January 2004

Soffit being installed on entrance canopy: 26 January 2004

Soffit being installed on entrance canopy: 26 January 2004

Office windows have been installed: 24 January 2004

Office windows have been installed: 24 January 2004

Aerial view of the museum: 13 January 2004

Aerial view of the museum: 13 January 2004

Finishing touches for the person conducting a marriage ceremony: 7 January 2004

Finishing touches for the person conducting a marriage ceremony: 7 January 2004

Armatures for maquettes (preliminary models of sculptures): 7 January 2004

Armatures for maquettes (preliminary models of sculptures): 7 January 2004

Sculpting of Adam figure (being formed out of the dust): 7 January 2004

Sculpting of Adam figure (being formed out of the dust): 7 January 2004

Creation Walk: 7 January 2004

Creation Walk: 7 January 2004

Museum lobby: 7 January 2004

Museum lobby: 7 January 2004

Planetarium entrance from the museum lobby: 7 January 2004

Planetarium entrance from the museum lobby: 7 January 2004

Future office space: 7 January 2004

Future office space: 7 January 2004

The steel for the path that will wind through ?Corruption Valley? is being installed: 31 December 2003

The steel for the path that will wind through ?Corruption Valley? is being installed: 31 December 2003

Interior museum work continues: 31 December 2003

Interior museum work continues: 31 December 2003

Museum exterior: 23 October 2003

Museum exterior: 23 October 2003

Museum interior: 23 October 2003

Museum interior: 23 October 2003

Aerial view of the museum from the east: 25 September 2003

Aerial view of the museum from the east: 25 September 2003

Museum interior, including north mezzanine with freshly poured concrete slab (far side of building): 25 September 2003

Museum interior, including north mezzanine with freshly poured concrete slab (far side of building): 25 September 2003

The office section steel is up and the concrete floor slab is being poured: 25 September 2003

The office section steel is up and the concrete floor slab is being poured: 25 September 2003

View of the museum from the south side of the lake: 11 September 2003

View of the museum from the south side of the lake: 11 September 2003

The north mezzanine inside the museum: 11 September 2003

The north mezzanine inside the museum: 11 September 2003

The south mezzanine is up and has been prepared for a concrete slab floor to be poured.: 4 September 2003

The south mezzanine is up and has been prepared for a concrete slab floor to be poured.: 4 September 2003

Some of the steel for the office has been delivered: 4 September 2003

Some of the steel for the office has been delivered: 4 September 2003

View of museum from southwest: 28 August 2003

View of museum from southwest: 28 August 2003

Front parking lots have been paved: 26 August 2003

Front parking lots have been paved: 26 August 2003

Front parking lot has been graded for paving: 15 August 2003

Front parking lot has been graded for paving: 15 August 2003

Front driveway being prepared for paving: 15 August 2003

Front driveway being prepared for paving: 15 August 2003

Front driveway prior to paving preparation: 5 August 2003

Front driveway prior to paving preparation: 5 August 2003

Footings are being installed for the theater: 31 July 2003

Footings are being installed for the theater: 31 July 2003

A dozer is preparing the office floor slab: 31 July 2003

A dozer is preparing the office floor slab: 31 July 2003

Overall view from the west above the car parking lot: 24 July 2003

Overall view from the west above the car parking lot: 24 July 2003